Main Page arrow 47/2/2002 arrow Selection criteria of the function of exploitation costs
 
 
Main Menu
Main Page
Current issue
Browse Archives
Download
Editorial Board
Author Guidelines
Subscription
Links
Contact Us
Search
Download
Category2011(56)
Category2010(59)
Category2009(50)
Category2008(40)
Category2007(33)
Journal Content
User


Lost Password?
No account yet? Register
Selection criteria of the function of exploitation costs PDF Print E-mail
User Rating: / 0
PoorBest 

Selection criteria of the function of exploitation costs

Author: K. Czopek

A method of selecting the function of the costs of rectilinear or curvilinear exploitation is presented.

The Cobb-Douglas function of production has been used for this purpose. The function of costs is an inverse function of the Cobb-Douglas function.

Next, the equation of the curve of production costs was plotted applying the initial power function. Its diagram was shifted by the vector [p,q] obtaining the curve that does not cross the beginning of the system.

Furthermore, the Newton formula for the development of the binomial to the power n was used. As a result, a polynomial was obtained that must satisfy the criteria mentioned in the paper, thus being a polynomial of the third order.

 
< Prev   Next >